424
The Saudi Ministry of Energy is building two renewable energy plants on two land plots with a total area of 12 million square meters. These are part of the Kingdom’s plan to generate 50% of its energy from renewables.
The plants will have a capacity of 600 megawatts. They will be implemented in the Third Industrial City in Jeddah and the Industrial City in Rabigh through the Saudi Authority for Industrial Cities and Technology Zones MODON.